Environmental baseline studies for operating coal fired power stations

Mt Piper power station

Bayswater power station

Stage 1 Preliminary Environmental Site Assessment – October 2013 

Stage 2 Environmental Site Assessment – January 2014

Liddell power station

Stage 1 Preliminary Environmental Site Assessment – October 2013 

Stage 2 Environmental Site Assessment – January 2014

Bayswater and Liddell power stations: Additional Pre-Existing Contamination Study – February 2018

Vales Point power station

Eraring power station

Last updated: 05/08/2024