Client Agency:

RMS

Project Description:

The project involves:

  • The financing, design, construction, operation and maintenance of a 3.6 km long motorway in twin tunnels between the Epping Road bridge crossing of the Lane Cove River in Lane Cove West and the Gore Hill Freeway in Artarmon
  • The financing, design, construction, operation and maintenance of two tolled north-facing ramps connecting the Warringah Freeway in North Sydney with Falcon Street and Military Road, and

The financing, design and construction of associated improvements to existing surface roads and intersections, including: widening of the Gore Hill Freeway to six lanes, including a transit lane in each direction, and major modifications to Epping Road and Longueville Road between Wicks Road in North Ryde and the Gore Hill Freeway in Artarmon, to improve facilities for cyclists, pedestrians and public transport.

The project has been funded, designed and built by the private sector.

For further information on the project, refer to the RMS website.

Private Sector Partners:

Transurban (acquired in August 2010)

Project Details:

Contract value: $1.1 billion (Estimated Capital Cost at the time of the contract award)

Contract duration: 9-Dec-2003 to 9-Jan-2037 (since extended to 30-Jun-2048)

Operation began: 25-Mar-2007 

Project Variations:

Mar-2004

The additional costs of the new and revised north-facing and south-facing Falcon Street ramps, of just under $11.5 million, were met by the RTA. The RTA has also provided a net amount of $30 million for a series of other changes to the project.

Jan-2015

As part of the funding model for the NorthConnex project, amendments to the existing concession were made including an increase to the heavy vehicle toll multiplier and an extension to the concession end date.

Related Documents:

Contract Summary

Lane Cove Tunnel Post Implementation Review

 

Last updated: 28/08/2023